Description
Provide labour, equipment, tools and material for the construction of track as per customer drawings and required industrial specifications.
Negotiate source, procurement & manage logistics of all Track Material including rail, ties, ballast, turnouts, tie plates, joint bars, anchors, compromise rails, lag screws, track spikes, and other OTM to meet CN Standards & Specifications for Industrial Track.
Work completed to meet or exceed CN Engineering Standards & Specifications for a HASMAT facility and Customer Satisfaction.
CN mainline turnouts constructed and installed within the track block time allotted with no disruption to service.
Project consisted of the following:
Suppy & Construct New & Relay 115lb RE Track: 66,000 TF
Supply, Construct & Install Switches: 10 each #8-115 SGM, 13 each #10-115 SGM, 2 each #12-115 RBM CN mainline switches
Supply, Construct & Install DSP Derails : 2 each
Supply & Install Bumper Posts: 19 each
Supply & Construct Plank Crossing: 25 each
Supply & Install Ballast: 46,500 Tonnes
Lift,Line & Surface: all track & switches
Trackage inspected by qualified Cariboo Supervisor with Northern Plains Engineer and CN Engineering approving the structure for operating service.