Provide supervision, labour, equipment, and tools for the construction of track and re-alignment/refurbishment of existing track as per engineering design drawings to CN Engineering Standards and Specifications. Construction was 50% wood tie and 50% concrete tie. All track material was supplied by CN. Work was performed under traffic within work blocks determined with CN Transportation.

Project consisted of the following:

Construction of New 136lb Track: 25,300 TF

Realignment/Refurbishment of Existing Track: 13,120 TF

Construct & Install Switches: 7 each #12-136 RBM mainline  

Unload & Place Ballast: 340 cars

Lift, Line & Surface: 38,420 TF

Destressing: 38,420 TF

Thermite Welding: 233 Welds

Trackage inspected to inspected Sept 30/18 and approved for operating service.