Description
Provide supervision, labour, equipment, and tools for the construction of track and re-alignment/refurbishment of existing track as per engineering design drawings to CN Engineering Standards and Specifications. All track material was supplied by CN. Work was performed under traffic within work blocks determined with CN Transportation.
Project consisted of the following:
Construction of New Track: 33,000 Track Feet (TF)
Re-construction of Existing Track: 7,000 TF
Construct & Install Switches: 7 each #20/#12-136lb RBM switches including ML and customer tracks.
Load & Place Ballast: 275 cars
Lift, Line & Surface: 40,000 TF
Destressing: 40,000 TF
Thermite Welding: 265 Welds
Track inspected by CN Engineering Sept 30/18 and approved for operating service.