Louis Dreyfus Commodities

Description

Provide labour, equipment, tools and material for the construction of track as per customer drawings and required industrial specifications.

Negotiate source, procurement & manage logistics of all Track Material including rail, ties, ballast, turnouts, tie plates, joint bars, anchors, compromise rails, lag screws, track spikes, and other OTM to meet CN Standards & Specifications for Industrial Track.

Work completed to meet or exceed CN Engineering Standards & Specifications and Customer Satisfaction.

Work was performed beside live track with no disruption to facility operations.

Project consisted of the following:

Supply & Construct New 115lb RE Track: 9,500 TF

Supply, Construct & Install Switches: 16 each #8-115 SGM incl. x-overs, 1 each #10-115 RBM CN ML

Supply, Construct & Install 115lb DSP Derail: 1

Supply & Install Ballast: 9,000 Cu.Yards

Lift, Line & Surface: all track & switches

Trackage inspected by qualified Cariboo Supervisor with Customer, AECOM Engineer, CN Engineering & CP Engineering approving the structure for operating service.

Project
Louis Dreyfus Commodities

Location
Yorkton, SK

Client
Louis Dreyfus Commodities